PHASE I: INSPECTION

Visual confirmation against spec.
Variance tolerance: ±0.0mm.

SOURCE: Floor Log 409-B STATUS: CLEAR

PHASE II: VERIFICATION

Independent measurement.
Cross-check against known standard.

INSTRUMENT: Calibrated Laser DRIFT: 0.00%

PHASE III: AUDIT

Permanent record.
The chain of custody closes.

SIGNATURE: ALBERT KARACA CYCLE: LOCKED