PREVENTION
PROTOCOL
Albert Karaca • Saint Anthony, Idaho
CYCLE: PRE-SHIFT INSPECTION
DISCIPLINE IS THE FOUNDATION
THIRTY YEARS
CASINO FLOOR COMPLIANCE • MODEL RAILROAD PRECISION
ACCURACY: 99.4%
ZERO DEVIATION TOLERATED
THE TOOLS
CALIBRATED CALIPER • HAND-FORGED CHISEL • SPIRIT LEVEL
TOLERANCE: 0.001"
EVERY BLADE SHARPENED
THE PROTOCOL
INSPECT • PLAN • EXECUTE • VERIFY
TRIPLE-VERIFIED LOGS
THE PERFECT JOINT HOLDS FOREVER