Colony Assembly Bench

Workshop benches built right translate straight to habitat assembly stations. Same clamp discipline, same square checks before every joint.

Core Specs from the Shop

14-Week Build Cycle

Week 1-2: Cut and flatten top. Week 3-4: Leg joinery with mortise & tenon. Week 5-6: Install tracks and test clamps on sample habitat panels. Weeks 7-14: Integrate with team station rotations; log every torque value.

Like building a chair that holds the whole team — no wobble allowed when we seal the next module.