Extending IT variance logs to colony O2 systems. 99.4% uptime target. Cycle: Week 1-14, metrics verified pre-deployment.
| Week | Electrolysis Rate (kg/h) | CO2 Scrub Efficiency | Verification |
|---|---|---|---|
| 1-2 | 4.2 | 99.1% | Tick logged, variance <0.05 |
| 3-4 | 4.15 | 99.3% | Filter swap scheduled |
| 5-8 | 4.18 | 99.4% | Full system audit |
| 9-14 | 4.22 | 99.5% | Redundancy check complete |
Protocol locked. Next: thermal integration.